Ohio River Bridges Project Expects a $3 Billion Toll Surplus through 2054

Insider Louisville reports, “The states of Kentucky and Indiana expect the tolling revenue for the Ohio River Bridges project to generate a surplus of more than $3 billion through 2054. The state of Indiana expects that after construction, maintenance and operations costs through 2054, it will have nearly $1.2 billion left over. The state of Kentucky projects a surplus of about $2 billion. Both states emphasized that the figures are projections.”