Orlando Sentinel reports that FDOT “selected a design-build team to be led by Superior Construction to build a section of the Wekiva Parkway in parts of Lake and Seminole Counties. The team’s bid of $234.5 million is to construct 6 miles of the toll road, which will be mostly elevated along the corridor of State Road 46. . . .”