RiverLink Camera Testing Begins on the Lincoln Bridge

The Courier-Journal (Louisville) reports that the installation of two test cameras on the Abraham Lincoln Bridge marks the advance of the new RiverLink all-electronic tolling system. The newspaper adds that Ohio River Bridges tolling operations will not begin “until cross-river capacity is added to the area transportation system, probably not before December.”